For a hospitality rug, begin the fire-documentation request with the exact rug and the requirements supplied by the project’s responsible professional. Ask what supporting documentation is available for that selection and have the project team assess it before ordering. A material name, a collection description or an internal durability table does not establish project approval.
A useful request names the collection, colorway and finished dimensions, then describes the intended room and installation. Include the specified fiber and construction, plus the proposed backing and underlay where relevant. Keep the same product reference on the sample, quotation and document request.
For custom work, record any changes to the standard quality. A change in material or construction needs to remain visible in the specification. WOVEN’s bespoke process includes design and sample approvals; those approvals concern the selected design and materials and should not be treated as fire-test evidence.
Ask the architect, code consultant or other responsible project professional to state what evidence the project needs. That written requirement gives the supplier a specific request to answer. It also allows the project team to identify a gap while other rug choices are still possible.
Our role in the product discussion is to identify the proposed WOVEN quality and clarify the documentation available for it. The project’s technical reviewers must determine which requirements apply and whether the evidence is acceptable for the installation.
A collection page can help establish the rug’s material, texture and design. A sample helps the designer assess color and surface. Neither gives a fire-performance conclusion on its own. The same distinction applies to a previous hospitality installation: a rug’s use in another property does not establish acceptance for this project.
If a report is supplied, keep its product identification, issue date and stated scope with the project record. Let the responsible technical reviewer resolve differences between the report and the final specification. An unavailable or incomplete document is an open procurement question, not a reason to describe the rug as having passed or failed a requirement.
When the rug, backing or installation changes, send the revised information to the reviewer. Retain the final product specification and the project’s acceptance record together so purchasing and installation refer to the same selection.
Our hospitality rug specification guide covers the wider selection brief. Start the documentation conversation while that brief is being developed, with the intended use and the exact rug clearly identified.